KitLog pro

Powered By Kitlog Pro v2.0

Jonathan's RV-8 Build
' style=
Date:  9-27-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  HS Rear Spar Assembly Part 1

Had a productive, albeit, slow paced day in the shop. Took me a while to get the rear spar doublers to the satin finish called for in the plans. I definitely took my time with them and am very pleased with how they turned out. Once done with those, I match drilled all the holes to the required #30, minus the 4 that I drilled with #21.
' style=

Smoothing

Smoothing

' style=

Finished Doublers in Spar

Finished Doublers in Spar

' style=

Satin Finish, Ready to Match Drrill

Satin Finish, Ready to Match Drrill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.