Powered By Kitlog Pro v2.0
Jon's Skybolt Project
Skybolt
All
1-11-2015
< Previous Log Entry
Next Log Entry >
Date:
1-11-2015
Number of Hours:
2.00
Manual Reference:
Brief Description:
Spar racks and spars levelled
Clamped the spars to the spar racks to check alignment before installing ribs. Came together very well with near-perfect alignment.
Spar racks and spars
All levelled
Alignment checked
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Skybolt Home
Category
# Logs
# Hours
All
152
276
Empennage
2
3
Fuselage
5
8
Miscellaneous
3
Rigging
13
26
Shop Supplies
1
Tools
1
2
Wings
124
226
Workshop
3
11
Copyright © 2001-2024 Matronics. All Rights Reserved.