KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  7-2-2014
Number of Hours:  1.00
Manual Reference:  8-6
Brief Description:  More riveting - forward substructure

The F802N-1 Forward upper brace - and the F802T-1 Aft upper brace got riveted and bolted to 24 foot lbs. The throttle quadrant bracket was install along with the 3 platenuts.
' style=

braces bolted/riveted

braces bolted/riveted

' style=

throttle quadrant bracket

throttle quadrant bracket

' style=

current state of affairs

current state of affairs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.