KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  8-31-2023
Number of Hours:  0.60
Manual Reference:  
Brief Description:  Engine #17 - Red Cube fittings

The fittings for the red cube arrived from VA today, as Bob had a few extras that he graciously sent my way. I was anxious to get them on and torqued, so I applied the Permatex thread sealant and torqued the top to 8 ft/lbs. The bottom went up to 10 ft/lbs because I needed to line up the angled fitting. The spec was from 8-10 ft/lbs with a no-go limit of anything above 12 ft/lbs, so I stayed well within that spec.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.