Date:  8-4-2023
Number of Hours:  0.00
Manual Reference:  10-3
Brief Description:  Landing Gear Fairing #16

With the left fairing drying, we went and picked up some lunch and then began working on the right fairing. As this process was known to both of us, it went quicker this time. Bob anticipated my thoughts and provided tape, string, and other assistance, and in no time, the strings were set, and we were making final measurements and squirting foam...but not too much.
' style=

Bob doing some pre-foam inspection work

Bob doing some pre-foam inspection work

' style=

Jig in place, waiting for the foam to dry

Jig in place, waiting for the foam to dry