KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  2-28-2023
Number of Hours:  3.00
Manual Reference:  
Brief Description:  ANL + shunt wiring

The goal is to make the ANL wire runs as short as possible because the longer the wire runs, the more firewall area is used. So I figured I could butt two connectors against each other with zero insulation if I crimped them one at a time. So that's what I did. I am happy with how they turned out since I had no remaining brass bar stock. I am running #6 out to the Main 60A alternator and #8 to the 30A backup alternator.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.