KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  2-3-2023
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Manufacture the tie-down anchor

Looking ahead to when the engine is installed on the airframe, I mixed up some concrete in a large chlorine bucket to make a tie-down anchor for the aft end of the airframe. I anchored two u-bolts with a stainless steel clamp to anchor the rings in. We also had to put the obligatory initials into the concrete as it was drying.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.