KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  7-16-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Boost Pump, Pitot Heat and Pitot Ground wired

After pre-organizing the wires, I cut them, made a service loop and crimped the terminals on the Pitot Heat wires, the Boost Pump wires and the Pitot Heat ground wire. After that was all done, I traded out the zip ties for lacing.
' style=

zip ties

zip ties

' style=

After lacing

After lacing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.