KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  6-27-2022
Number of Hours:  1.90
Manual Reference:  
Brief Description:  C/B bank wiring - AeroLED lights

With yesterday's progress getting the pitot heat wires run through the fuselage, I ran the pitot heat power wire from the CB to the switch. I don't have the proper terminal for that larger gauge wire so I will wait on that, but the wire is in place, and the labels are on. Next, I focused on the four remaining C/Bs on that row, the AeroLED landing, taxi, navigation, and strobe light power to switch wires. Since these are all loose wires going from/to the same place, I cut, label, terminate, and pull-test all of them before installing them on the C/B bank, making it much more manageable.

Other than the flap power wire, the C/B bank is 19/20 done.
' style=

bench made wires, labels and terminated

bench made wires, labels and terminated

' style=

lights wired to the C/B bank

lights wired to the C/B bank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.