KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  4-9-2022
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Electrical consult + dessicant change

The first order of business was to check the desiccant, and I determined that it was close enough to change. Since I was getting low on dry desiccant, I decided to bake the pink stuff and remove the moisture. It's amazing how much gets into the closed bag - or maybe it's what is picked up when the bag is opened for the changes? After baking the pink ones, I saw that the blue stuff needed de-moisturizing too, so I baked it. All done with the engine desiccant for this round.

I spent the rest of the time consulting with Bob about electrical needs, switch terminal numbering, and BNC/TNC connection needs. With this intel, I worked up a parts order. No real visual progress was made, but still, progress nonetheless. There were no consultation or shopping pictures - so I used the desiccant pics.
' style=

pink crystals - pre oven

pink crystals - pre oven

' style=

new blue vs. old blue in the center

new blue vs. old blue in the center

' style=

refreshed again

refreshed again

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.