KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  10-7-2021
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Cradle angle and aluminum sheet work

I fabricated the rest of the two structures that will hold the remote boxes in the cradle (GAD29 and GEA24). I drilled the holes for the nutplates and prepped and primed the angle and sheet. The aluminum sheet is 1/16” so it is plenty sturdy – might drill some lightening holes.

Forgot to take pictures of the process, so snapped a pic of the drying parts
' style=

one angle had already been primed

one angle had already been primed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.