A finalized both sides of the transponder support and got them built out today. I am still leaving a little rotation room by only drilling and installing one cleco per side as I want to verify that the top skin in place does not change the geometry. All good, test passed.
With the transponder rack in place temporarily, I will move to the other boxes and decide on their locations