Brief Description: More Labels, wire run placement
I took the latest changes from the electrical plan document and made sure that the CB's and fuses were up to date. The TCW backup battery was a new addition as I had recently decided to incorporate the backup battery and now needed to flow those changes thru the rest of the documentation and design.
I was originally planning to run some wire from the Batt Bus to the relay and then over to the CBs for the E-Bus (Extra bus). But as I was thinking of where to run the wires, I was also thinking that the Garmin box supports will need to be attached along those same channels. I believe there will be room for both structure and wires as the two channels consist of three surfaces and 6-sides, but I do need to decide on which surface each will be occupying.