KitLog pro

Powered By Kitlog Pro v2.0

Jims RV-8
' style=
Date:  8-15-2021
Number of Hours:  2.40
Manual Reference:  
Brief Description:  Bundling and tidying the wires

With the lights installed and functioning properly I wanted to loop back and tidy up the wires into a more aesthetic bundle. I also wanted to support the light wires and some of the other wires in place with tie-wrap mounts. I glued these in with JB Weld so these were really done yesterday and I came back to work with them after to the glue dried.

With the glue dried, I pulled the supporting tape from the tie wraps mounts and bundled up the wires. While I was at the beautification game, I pulled off the right-side console and wrapped those wires up too. I know this is temporary, but it has been driving me crazy. Done.

It's like when you weed the beds in the front yard, then the back yard beds look bad and need immediate attention.
' style=

lights hanging free - blue tape covering the tie wrap mount

lights hanging free - blue tape covering the tie wrap mount

' style=

bundled up the loose wires

bundled up the loose wires

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.