I spent some more time filling in the holes in the panel with the circuit breakers. I first verified the amp limits needed from the electrical plan and then wrote them out on a print out of the hole pattern. This was easier than looking each one of them up individually.
As happens, the revisions happened after the order was placed as I have a few spare 1-3 switches and need one 2-10...and I also have one spare CB but need two others. Time to place another order at B and C