6-11-2016
< Previous Log Entry
Next Log Entry >
Date:
6-11-2016
Number of Hours:
1.50
Manual Reference:
8-51
Brief Description:
seat ramp stuff
Seat ramp ribs and seat ramp support parts have been drilled, deburred, edged, dimpled and scuffed awaiting priming. I was going to prime them, but then I figured I would work the consoles and then prime everything together in a bigger batch.
parts ready for priming
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1653
3288
Avionics
71
158
Baffles
7
25
Canopy
127
277
Cowling
31
69
Electrical
252
533
Empennage
139
331
Engine
53
64
Finishing
6
6
Firewall Forward
23
41
Fuselage
509
1008
Lighting
21
38
Miscellaneous
39
15
None
34
Paint
2
4
Pre-build
7
Prop
3
7
Signings
7
Tools
3
Wheels, Brakes, Misc
50
102
Wings
269
610
Copyright © 2001-2024 Matronics. All Rights Reserved.