Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Aileron Actuation
5-24-2008
< Previous Log Entry
Next Log Entry >
Date:
5-24-2008
Number of Hours:
2.50
Manual Reference:
23-1 - 23-3
Brief Description:
Torque Tube to BellCrank Pushrod
23-2
Step 1: Made two Torque Tube to Bellcrank Pushrods from AT6-049 x 1 1/4 tube.
Step 2: Built my own jig for locating rivet holes in Torque tube. (See Pictures)
Step 3: Match drilled the VA 169 Threaded rod ends into each of the torque tubes.
Removed parts and deburred then primed all pieces inside and out.
23-3
Step 1: Made two W-1018A Bellcrank to Aileron Pushrods from ST4130-035 x 1/2 Steel Tube.
Step 2: Drilled 4 #40 pilot holes in each end of both pushrods.
Deburred inside and out.
Step 3: Match drilled the AN490-HT8P threaded rod ends into the pushrods.
Step 4:Marked all parts for proper orientation then removed and primed inside and out where paint was removed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.