Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
All
7-19-2008
< Previous Log Entry
Next Log Entry >
Date:
7-19-2008
Number of Hours:
3.00
Manual Reference:
34-2 - 34-4
Brief Description:
Baggage door assembly
34-2
Step 1: bent the F 1059B Upper frame to the proper set.
Step 2: Clecoed the frame to the F 1059E Skin.
Steps 3 & 4: Repeated process for lower frame as well.
Step 5: Clecoed the F 1059A frame to the tabs on the other frames and to skin.
Step 6: Clecoed lock bracket to frame and skin.
Step 7: Clecoed the Closeout panel to the F1059A,B and C frames
34-3
Step 1: Centered door in opening and marked the upper and lower hinge recess points.
Step 2: Made hinge from AN257-P3 material.
Step 3: Removed close out panel;.
Step 4: Match drilled hinge to the forward frame. Checked for .025 clearance.
34-4
Step 1: Dissaemble and deburr all door parts.
Step 2: MCS holes in hinge for 426-ad3 rivets.
Step 3: Dimple the holesin the close out panel and the underlying frames.
Step 4: didn't prime
Step 5: Riveted hinge to forward frame.
Step 6: Riveted frames to F 1059E skin and to each other.
Step 7: Riveted lock bracket to skin and upper frame.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.