Using L4, cut and fit capstrips, uprights, diagonals, and gussets. Cleaned up 14 nose ribs that will be used in this jig. Set up AC in the garage. Much better. Impossible to work during the day in there without something to cool it down a little! I would have been sweating all over the MDF jigs and rib wood.