Bent the top track piece in place. Drilled and clecoed the track pieces together. Contersunk on both sides and double countersunk/squeezed the #3 rivets in place. Measured and drilled the holes in the fuselage and installed the #6 screws and nuts.Installed the14" hreaded rod and secured the nuts.