KitLog pro

Powered By Kitlog Pro v2.0

HAKAN'S WEB SITE
308 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-04-2013
12.0
Condition inspection
Details
       

 04-30-2013
1.0
Oil change
Details
     

 04-30-2013
1.0
New brake lines
Details
       

 04-30-2013
0.5
ID plate
Details
     

 04-30-2013
1.5
Bleeding the brakes
Details
       

 04-28-2013
3.0
Compression and timing check
Details
     

 04-27-2013
3.0
Transition training
Details
       

 04-21-2013
4.0
Weight and balance
Details
       

 04-20-2013
3.0
Replacing static ports
Details
       

 04-20-2013
3.0
Interior
Details
       

 04-19-2013
1.0
Installing fire extinguisher
Details
     

 04-17-2013
2.0
Right wing flap installed
Details
       

 04-17-2013
4.0
Installing ailerons
Details
       

 04-15-2013
1.0
Right wing and wingtip in place
Details
       

 04-15-2013
1.0
Final right wing bolts and torque
Details
     

 04-15-2013
2.0
Balancing the ailerons
Details
       

 04-13-2013
3.0
Right wing installed
Details
       

 04-11-2013
4.0
riveting rear spar in place
Details
       

 04-11-2013
3.0
Preparing new rear spar
Details
       

 04-07-2013
1.0
Wing flap indicator
Details
       

 04-07-2013
0.5
Left wing on
Details
       

 04-06-2013
5.0
Undrilling the rear spar
Details
       

 04-06-2013
3.0
Rear spar removal
Details
       

 04-05-2013
3.0
Static leak test and wing tip lights
Details
       

 04-05-2013
3.0
Flap pushrod installation
Details
     

 04-03-2013
2.0
Mishap...
Details
       

 04-02-2013
2.0
Weather strip seals
Details
       

 04-02-2013
1.0
Step anti slip
Details
       

 04-02-2013
5.0
Installing left wing
Details
       

 04-02-2013
1.0
Harnesses
Details
     

 03-30-2013
3.0
Installing rudder and cables
Details
       

 03-30-2013
3.0
Installing cowl fasteners
Details
       

 03-30-2013
1.0
Connected the tail lights
Details
     

 03-30-2013
2.0
Added heat protection
Details
       

 03-28-2013
2.0
Re-attaching the antennas
Details
       

 03-28-2013
2.5
Elevator re-balance
Details
       

 03-28-2013
2.0
Elevator attach and control rod
Details
       

 03-27-2013
2.0
Attached the horizontal and vertical tail
Details
       

 03-26-2013
3.0
Aircraft in hangar
Details
       

 03-23-2013
5.0
Preparing the hangar
Details
       

 03-22-2013
3.0
Paint almost done
Details
       

 03-16-2013
6.0
In the paint shop 2
Details
       

 03-08-2013
2.0
In the paint shop
Details
       

 02-27-2013
4.0
To the paint shop !
Details
       

 02-02-2013
2.0
Sound dampening tape
Details
       

 01-31-2013
1.5
Nuts for main landing gear
Details
       

 01-31-2013
1.5
New main gear axle nuts installation
Details
       

 01-20-2013
2.0
Spar covers
Details
       

 01-20-2013
1.0
Engine plenum
Details
     

 01-19-2013
1.0
Tank selector
Details
     

 01-19-2013
2.0
Rivnuts for interior panels
Details
       

 01-19-2013
10.0
Hardware for assembly
Details
       

 01-19-2013
1.0
Co-pilot stick installation
Details
     

 01-18-2013
1.0
Pilot stick labels
Details
     

 01-18-2013
2.0
Aileron trim decal
Details
       

 01-07-2013
12.0
wing fairing nutplates
Details
       

 01-06-2013
5.0
Aligning wing fairings
Details
       

 12-17-2012
2.0
More primer
Details
       

 12-16-2012
3.0
Super Fil and sanding
Details
       

 12-15-2012
3.0
Nose gear leg fairing
Details
       

 12-14-2012
3.0
Wing fairings
Details
       

 12-10-2012
3.0
Interior arrived
Details
       

 12-09-2012
4.0
More primer
Details
       

 12-08-2012
7.0
Fitting wheel pants
Details
       

 12-06-2012
5.0
Bondo and primer
Details
       

 12-06-2012
3.0
Added nutlpates to nose wheel fairing
Details
       

 12-05-2012
8.0
Body work on fiberglass parts
Details
       

 12-02-2012
6.0
Wheel fairing fixes
Details
       

 12-02-2012
4.0
Nose gear leg fairing
Details
       

 12-02-2012
2.0
Main leg fairing reinforcement
Details
       

 12-02-2012
2.0
Cowl flap fairing
Details
     

 12-01-2012
6.0
Sanding wheel pants
Details
     

 11-30-2012
2.0
Started the body work on the main gear fairings
Details
       

 11-30-2012
6.0
main gear leg fairings
Details
       

 11-30-2012
5.0
Cowl flap alignment fairing
Details
       

 11-28-2012
2.0
Main wheel fairing outer attach
Details
       

 11-28-2012
4.0
Bonding intersection fairings
Details
       

 11-27-2012
2.0
Nose gear upper intersection fairing
Details
     

 11-26-2012
8.0
Flanges on wheel pants fairings
Details
       

 11-25-2012
4.0
Wheel fairings
Details
       

 11-25-2012
1.0
Wheel fairing nutplates
Details
       

 11-25-2012
6.0
Main wheel pants
Details
       

 11-19-2012
4.0
Nose gear fairing reinforcements
Details
       

 11-18-2012
10.0
Nose gear intersection fairing
Details
       

 11-17-2012
6.0
Nose gear wheel pant
Details
       

 11-16-2012
2.0
Nose gear break out force
Details
       

 11-15-2012
10.0
installing the lower empennage fairing
Details
       

 11-14-2012
3.0
Primer
Details
       

 11-14-2012
4.0
Nutplates for exhaust fairing
Details
       

 11-13-2012
1.0
Safety wire on gascolator
Details
     

 11-12-2012
2.0
Rudder cable fairing
Details
       

 11-11-2012
2.0
Oil door
Details
       

 11-11-2012
5.0
More body work
Details
       

 11-10-2012
2.0
Exhaust fairing
Details
       

 11-10-2012
6.0
Cowling body work
Details
       

 11-09-2012
3.0
Nutplates for empennage fairing
Details
       

 11-08-2012
3.0
Attachment clip for horizontal fairing
Details
       

 11-07-2012
4.0
Empennage nutplates
Details
       

 11-05-2012
6.0
Access door frame
Details
       

 11-02-2012
8.0
Oil access dor on cowling
Details
       

 11-01-2012
6.0
Empennage fairing
Details
     

 10-31-2012
8.0
Exhaust exit fairing 3
Details
     

 10-29-2012
3.0
Exhaust exit fairing 2
Details
       

 10-28-2012
5.0
Exhaust exit fairing 1
Details
       

 10-20-2012
2.0
Cowl flap vernier attachment bracket
Details
     

 10-20-2012
1.0
Cowl flap functional test
Details
       

 10-20-2012
2.0
Cowl fastener part 2
Details
       

 10-19-2012
2.0
Preliminary attachment of cowl flap
Details
       

 10-19-2012
3.0
Cowl attachments fasteners
Details
       

 10-18-2012
2.0
Cowl flap part 2
Details
       

 10-17-2012
5.0
Cowl flap
Details
       

 10-14-2012
1.0
Main bulkhead cap strips/covers
Details
       

 10-14-2012
2.0
Glare sheild padding
Details
       

 10-14-2012
8.0
Empennage fairing
Details
       

 10-14-2012
3.0
Cowl flap cutout
Details
       

 10-13-2012
2.0
Sun shades
Details
       

 10-11-2012
1.0
Canopy handles
Details
       

 10-11-2012
3.0
Aileron spring trim system
Details
       

 10-09-2012
6.0
Sticks and stick grips
Details
       

 10-08-2012
3.0
Fitting engine plenum inlets
Details
       

 10-07-2012
6.0
Plenum inlets
Details
       

 10-06-2012
1.0
Removed canopy protective film
Details
       

 10-06-2012
4.0
FAB drain line
Details
     

 10-05-2012
3.0
Oil return lines
Details
       

 10-05-2012
2.0
FAB fuel drain
Details
       

 09-30-2012
4.0
Engine run-up 2
Details
       

 09-30-2012
8.0
Engine plenum modification
Details
       

 09-28-2012
6.0
Molding grooves for inlet
Details
       

 09-22-2012
5.0
Engine startup
Details
       

 09-20-2012
4.0
Air filter box complete
Details
       

 09-19-2012
6.0
Cowl inlet
Details
       

 09-17-2012
10.0
Air filter box
Details
       

 09-11-2012
8.0
Canopy frame 3
Details
       

 09-05-2012
8.0
Canopy skirt 2
Details
       

 09-03-2012
2.0
Fwd cowl attach
Details
       

 09-02-2012
8.0
Windshield fairing
Details
       

 09-01-2012
8.0
Canopy skirt
Details
       

 08-27-2012
2.0
Bonded windshield fairing
Details
       

 08-26-2012
9.0
Trimming lower cowl
Details
       

 08-26-2012
6.0
Trimmed windshield fairing
Details
       

 08-26-2012
2.0
Cowl side strips
Details
       

 08-24-2012
4.0
Windshield bonded
Details
       

 08-23-2012
2.0
Preparing windshield for bonding
Details
       

 08-23-2012
2.0
Bond prepping the windshield
Details
       

 08-22-2012
2.0
Upper fwd fuselage skin and air vents
Details
       

 08-21-2012
2.0
Canopy handles
Details
       

 08-20-2012
2.0
Alternator safety wire and carb heat muff
Details
       

 08-18-2012
2.0
preparing the canopy for bonding
Details
       

 08-18-2012
2.0
Bonding the canopy to the frame
Details
       

 08-16-2012
3.0
fitting upper cowl
Details
       

 08-15-2012
3.0
Upper fwd skin riveting
Details
       

 08-15-2012
3.0
Started riveting the front upper skin 2
Details
       

 08-15-2012
3.0
Started riveting the front upper skin 1
Details
       

 08-12-2012
1.5
Painting canopy frame
Details
       

 08-07-2012
7.0
Trimming the windshield
Details
       

 08-06-2012
2.5
The big cut
Details
       

 08-06-2012
3.0
Canopy trial
Details
       

 08-05-2012
1.0
Initial fit of tail fairing
Details
     

 08-05-2012
3.0
Cowl attachment strips
Details
       

 08-04-2012
3.0
Windshield and canopy fairings
Details
       

 08-03-2012
8.0
started fitting the cowl
Details
       

 08-02-2012
1.0
New starter
Details
       

 08-01-2012
2.0
Trimming canopy
Details
       

 07-31-2012
2.0
heater muff
Details
       

 07-30-2012
8.0
Cowl extension
Details
       

 07-28-2012
0.5
Removed starter motor
Details
     

 07-28-2012
1.5
Prop arrives!
Details
       

 07-28-2012
7.0
Canopy tracks
Details
       

 07-28-2012
2.0
Canopy anchor blocks
Details
       

 07-28-2012
2.0
Anchor block and frame attach
Details
       

 07-27-2012
6.0
Cowl exit ramps
Details
       

 07-27-2012
5.0
Canopy frame
Details
     

 07-24-2012
2.0
Exhaust brackets
Details
       

 07-24-2012
1.0
Cockpit side covers
Details
       

 07-22-2012
4.0
Cowl exit ramp
Details
       

 07-21-2012
3.0
Rear canopy track
Details
       

 07-20-2012
5.0
Oil cooler
Details
       

 07-20-2012
3.0
Brake lines
Details
       

 07-17-2012
2.0
Backup washers for the roll over bar
Details
     

 07-16-2012
3.0
Trim tab brackets
Details
       

 07-16-2012
4.0
Roll over bar pre-installation
Details
       

 07-16-2012
3.0
Baggage compartment 2
Details
       

 07-16-2012
3.0
Baggage compartment
Details
       

 07-15-2012
6.0
Main wheels
Details
       

 07-15-2012
0.5
Alternator wire
Details
       

 07-14-2012
2.0
Wing drain fittings
Details
       

 07-14-2012
3.0
Trimmed the right step
Details
       

 07-14-2012
1.0
Step installation
Details
       

 07-14-2012
2.0
Main gear brakes
Details
       

 07-14-2012
3.0
Fuel vent inlets
Details
       

 07-13-2012
0.5
Engine ground strap
Details
       

 07-12-2012
3.0
Nose wheel preliminary installation
Details
     

 07-11-2012
2.0
Primer solenoid installed
Details
     

 07-10-2012
1.0
Manifold pressure sensor
Details
     

 07-10-2012
4.0
Dual throttle linkage and micture
Details
       

 07-09-2012
1.0
Fuel flow sensor
Details
     

 07-09-2012
4.0
CHT and EGT wires
Details
     

 07-07-2012
3.0
Skyview displays
Details
       

 07-07-2012
0.5
CHT probes
Details
     

 07-06-2012
2.0
Fuel and oil pressure
Details
       

 07-06-2012
3.0
Engine installation
Details
       

 07-05-2012
3.0
Engine mount installation
Details
     

 07-04-2012
8.0
Displays and engine controls
Details
       

 06-27-2012
12.0
Engine baffles
Details
       

 06-25-2012
0.5
Step fastener countersunk
Details
     

 06-23-2012
1.5
Turn and bank
Details
     

 06-09-2012
8.0
James plenum and baffles
Details
       

 06-08-2012
2.0
Marker beacon antenna
Details
       

 06-07-2012
5.0
marker beacon receiver
Details
     

 06-07-2012
3.0
hour meter
Details
     

 06-06-2012
2.0
right wing test fit and fuel lines
Details
       

 06-04-2012
2.0
Left wing, fuel lines and fwd wing attach
Details
       

 06-03-2012
2.0
ignition harness
Details
     

 06-02-2012
4.0
VHF antennas
Details
       

 06-01-2012
1.0
Transponder antenna
Details
       

 05-27-2012
2.0
Main landing gears
Details
       

 05-24-2012
4.0
Headset plugs
Details
       

 05-24-2012
0.5
attached standby alternator
Details
     

 05-22-2012
3.0
Left step installation
Details
       

 05-21-2012
2.0
Stby alternator install
Details
     

 05-19-2012
4.0
Finished riveting the wing
Details
       

 05-17-2012
3.0
First electrical power up
Details
       

 05-16-2012
2.0
VOR antenna connection
Details
       

 05-16-2012
3.0
Standby alternator and music wires
Details
       

 05-16-2012
1.0
RPM for Dynon
Details
       

 05-16-2012
3.0
Mic and push to talk
Details
     

 05-16-2012
1.0
Amp Hi and Loo detection
Details
       

 05-12-2012
4.0
Started riveting lower left wing skin
Details
       

 05-12-2012
1.0
EMS system CHT and EGT wires
Details
     

 05-12-2012
2.0
Antenna coax installation
Details
       

 05-11-2012
8.0
Installed avionics
Details
       

 05-10-2012
2.0
EMS tray
Details
       

 05-10-2012
2.0
EMS module and display batteries
Details
       

 05-09-2012
5.0
Parking brake
Details
       

 05-08-2012
0.5
Center tunnel
Details
     

 05-07-2012
1.0
Holes for engine controls
Details
       

 05-07-2012
1.0
Cleaning carburator
Details
       

 05-05-2012
4.0
Control subpanel and support panel installation
Details
       

 05-03-2012
1.0
Throttle control subpanel decals
Details
     

 05-03-2012
10.0
Switch wiring
Details
     

 05-03-2012
2.0
Relocation of brake reservoir
Details
       

 05-03-2012
0.5
Pitch trim rod adjustment
Details
     

 05-03-2012
3.0
Final installation of rudder pedals and brake cyl.
Details
       

 05-02-2012
3.0
Decals for new throttle sub panel
Details
     

 05-02-2012
5.0
Added passenger brake pedals, cylinders and lines
Details
       

 05-01-2012
9.0
Daisy-chain wiring for switches
Details
       

 05-01-2012
3.0
Canon plug for electrical turn and bank
Details
     

 04-30-2012
4.0
New controls subpanel
Details
       

 04-30-2012
4.0
Buzzing the electrical system
Details
       

 04-29-2012
3.0
Rudder return springs
Details
     

 04-29-2012
1.0
Map box handle and magnet
Details
       

 04-29-2012
5.0
Center tunnel modification
Details
       

 04-27-2012
2.0
Sub panel riveting
Details
       

 04-27-2012
8.0
Avionics tray support
Details
       

 04-26-2012
4.0
Lower rudder fairing bondo and sanding
Details
     

 04-26-2012
2.0
ELT installation complete
Details
     

 04-24-2012
8.0
Reinstalling Adahrs and OAT
Details
       

 04-24-2012
6.0
Readjusting the lower rudder fairing
Details
       

 04-22-2012
1.0
Rudder cable check
Details
     

 04-22-2012
4.0
Adahrs installed
Details
       

 04-21-2012
4.0
Preliminary instl of pitot/aoa tube
Details
       

 04-21-2012
2.0
ELT installation
Details
       

 04-21-2012
4.0
Auto pilot and Adahrs attachement to network hub
Details
     

 04-21-2012
8.0
Adahrs installation
Details
       

 04-20-2012
3.0
Installed cabin air vents
Details
       

 04-19-2012
15.0
Wiring
Details
       

 04-18-2012
7.0
Instrument panel done
Details
     

 04-17-2012
3.0
Adahrs installation has begun
Details
       

 04-15-2012
4.0
Started connecting the wires and pitot wires and t
Details
       

 04-15-2012
2.0
Assembled the electrical pitch trim
Details
       

 04-14-2012
6.0
Painting of various panels
Details
       

 04-12-2012
4.0
Finished map box
Details
       

 04-11-2012
9.0
More VPX wiring
Details
       

 04-11-2012
2.0
Engine arrives!
Details
       

 04-09-2012
2.0
Started making the pitot tube attachment
Details
       

 04-09-2012
4.0
Custom map box
Details
       

 04-08-2012
6.0
Upper fwd access panels part 2
Details
       

 04-08-2012
8.0
Upper fwd access panels 1 of 2
Details
       

 04-08-2012
7.0
Pitot and static line hookups and VPX pro install
Details
       

 04-07-2012
2.0
Riveting the subpanel to the main panel
Details
       

 04-07-2012
3.0
Installing avionic trays
Details
       

 04-06-2012
1.0
Pitch autopilot servo electrical connection
Details
     

 04-06-2012
5.0
Finished the electrical connections to the wings
Details
       

 04-06-2012
3.0
Added all the pitot, static and AOA lines
Details
       

 04-05-2012
4.0
Working on the new instrument panel
Details
       

 04-04-2012
4.0
Installing autopilot pitch servo
Details
       

 04-03-2012
1.5
Waterproof connectors
Details
       

 04-03-2012
4.0
Adding electrical fuel pump and bypass line
Details
       

 04-02-2012
6.0
Adding more wires to the aft fuselage
Details
       

 04-01-2012
6.0
More wiring
Details
       

 04-01-2012
6.0
More wiring
Details
       

 04-01-2012
8.0
More electrical wiring
Details
       

 04-01-2012
2.0
Markups of the wiring diagram
Details
       

 04-01-2012
1.0
First avionics equipment
Details
     

 04-01-2012
3.0
Access panels in fwd upper nose
Details
     

 03-29-2012
2.0
Tip lights
Details
       

 03-29-2012
4.0
Step cutout
Details
     

 03-29-2012
2.0
Brake lines
Details
     

 03-27-2012
4.0
Main fuel lines
Details
     

 03-27-2012
1.0
Finished the Strobe wire rear fuselage routing
Details
     

 03-26-2012
4.0
Routed strobe wires through fuselage
Details
       

 03-26-2012
2.0
Main fuel lines from wing and fuel vent lines.
Details
       

 03-25-2012
1.0
Installed strobe harness
Details
       

 03-25-2012
2.0
Attaching main landing gear mounts
Details
       

 03-24-2012
4.0
Soldered nav light
Details
       

 03-24-2012
2.0
Installing brake lines
Details
       

 03-23-2012
2.0
Fuel line from selector valve
Details
     

 03-22-2012
3.0
Kit arrives at home
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.