KitLog pro

Powered By Kitlog Pro v2.0

HAKAN'S WEB SITE
18 Logs Found 
 Date
Hours
Work Log Summary

Details

 03-30-2013
3.0
Installing rudder and cables
Details
       

 03-28-2013
2.5
Elevator re-balance
Details
       

 03-28-2013
2.0
Elevator attach and control rod
Details
       

 03-27-2013
2.0
Attached the horizontal and vertical tail
Details
       

 12-17-2012
2.0
More primer
Details
       

 12-16-2012
3.0
Super Fil and sanding
Details
       

 11-11-2012
5.0
More body work
Details
       

 11-09-2012
3.0
Nutplates for empennage fairing
Details
       

 11-07-2012
4.0
Empennage nutplates
Details
       

 11-01-2012
6.0
Empennage fairing
Details
     

 10-14-2012
8.0
Empennage fairing
Details
       

 08-05-2012
1.0
Initial fit of tail fairing
Details
     

 07-16-2012
3.0
Trim tab brackets
Details
       

 05-03-2012
0.5
Pitch trim rod adjustment
Details
     

 04-26-2012
4.0
Lower rudder fairing bondo and sanding
Details
     

 04-24-2012
6.0
Readjusting the lower rudder fairing
Details
       

 04-22-2012
1.0
Rudder cable check
Details
     

 04-15-2012
2.0
Assembled the electrical pitch trim
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.