Powered By Kitlog Pro v2.0
HAKAN'S WEB SITE
rv7a
All
12-2-2012
< Previous Log Entry
Next Log Entry >
Date:
12-2-2012
Number of Hours:
6.00
Manual Reference:
Brief Description:
Wheel fairing fixes
On all wheel fairings, including the intersection fairings, there are small gaps between parts. I mixed up a batch of epoxy/fiberglass filler, and applied in the gaps. First I masked the side that isnt supposed to have the gap filler.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
320/360 Home
rv7a Home
Category
# Logs
# Hours
All
317
1129
Avionics
27
92
Electrical
36
144
Empennage
18
58
Engine
32
116
Flight controls
4
9
Fuel
12
28
Fuselage
109
375
Interior
3
8
Landing gear
31
127
Miscellaneous
25
88
Prop
2
21
Wings
18
63
Copyright © 2001-2024 Matronics. All Rights Reserved.