Brief Description: EMS module and display batteries
Installed the EMS module and the 2 backup batteries for the Dynon displays. Attached with #8 screws and AN365 locknuts. Verified that I could reach in there with the top skin attached. Installed the network cable to the EMS module and routed to the network hub and secured with tie wraps. Made 2 1.5" dia holes in the subpanel and upper longeron for harness penetration. Edges were deburred and caterpillar grommets attached.