Brief Description: Prepration for Installation of Left Wing Skins
Have not been able to do any work since the end of November due to cold weather and requirements at work. Christmas holiday break was supposed to be a lot of build time but I ended up needing to work all but a few days. Managed to get to the hangar today and regrouped with where things were left off. Decided to begin some preparations for installation of the wing skins on the left wing per Section 17. Started preparation of some of the misc small parts required in this section. Did initial deburring of the VA-195H access cover. Prepared W-1204G-L hand hold per step 1 page 17-05. Prepared W-1213-L tip rib. Prepared W-1204C wing tip bottom skin. Started preparation of the W-1201-L wing skin by removing the plastic covering from the inside of the skin.