KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  8-21-2010
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Aileron control cables

Put together 8 aileron cable pulley assemblies and upper bell crank. Attached aileron cable from
control stick up to bell crank, but will wait to double wrap the 2 turnbuckles. Cable tension is not final, awaiting measturement on tensiometer.
' style=

Turnbuckles

Turnbuckles

' style=

Aileron pulleys

Aileron pulleys

' style=

Pulleys going up the back

Pulleys going up the back

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.