KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  8-7-2010
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Control sticks and push rods

Drilled through-holes for aileron connect tube pillow pads and attached to
steel frame on belly. Constructed 6 sleeves/bushings out of aluminum tubing
for various parts of the aileron/elevator assembly rods. It was necessary to
sand connect rod and steel tube it goes through due to powder coating on both.
Greased both for smooth forward/aft movement.
' style=

Push/pull connector

Push/pull connector

' style=

Sanding off powder coating

Sanding off powder coating

' style=

All connected

All connected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.