Powered By Kitlog Pro v2.0
Keiths Web Site
RV-12
06. Empennage
8-24-2009
< Previous Log Entry
Next Log Entry >
Date:
8-24-2009
Number of Hours:
1.00
Manual Reference:
P 09-09 Step 3
Brief Description:
Fit hinges to the aft tailplane flanges
Having prepared two new hinges, I riveted them in place. This time they fitted fine.
Picture 1 shows the left hinge ready for riveting. Picture 2 shows both left and right hinges riveted.
Left side ready to rivet
Both sides riveted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
573
1849
00. Construction Log
1
01. Personal
1
02. G-BLWY
3
03. Research
1
04. Workshop
20
40
05. Tools
1
06. Empennage
99
226
07. Wings
74
221
08. Fuselage
116
333
09. Finishing Kit
101
362
10. Avionics
15
37
11. Firewall Fwd
35
142
12. Lighting Kit
8
39
12. Panel
8
39
13. Autopilot
5
9
14. Interior Trim
1
15. Spats
1
16. Painting
47
177
17. Production Accep
23
212
18. Operation
2
19. Maintenance
1
20. Trips
1
Miscellaneous
9
12
Copyright © 2001-2024 Matronics. All Rights Reserved.