Powered By Kitlog Pro v2.0
Keiths Web Site
RV-12
06. Empennage
7-2-2009
< Previous Log Entry
Next Log Entry >
Date:
7-2-2009
Number of Hours:
0.50
Manual Reference:
P 10-04 Step 10
Brief Description:
Redo some rivets
I was not happy with some of the weird pop rivets used to attach the nutplates to the rear bulkhead. They were not flush with the surface. I drilled three rivets out, enlarged the countersink slightly, then re-riveted. Better, but still not perfect.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
573
1849
00. Construction Log
1
01. Personal
1
02. G-BLWY
3
03. Research
1
04. Workshop
20
40
05. Tools
1
06. Empennage
99
226
07. Wings
74
221
08. Fuselage
116
333
09. Finishing Kit
101
362
10. Avionics
15
37
11. Firewall Fwd
35
142
12. Lighting Kit
8
39
12. Panel
8
39
13. Autopilot
5
9
14. Interior Trim
1
15. Spats
1
16. Painting
47
177
17. Production Accep
23
212
18. Operation
2
19. Maintenance
1
20. Trips
1
Miscellaneous
9
12
Copyright © 2001-2024 Matronics. All Rights Reserved.