KitLog pro

Powered By Kitlog Pro v2.0

Keiths Web Site
' style=
Date:  5-24-2010
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Different sanding

After the "usual" canopy fairing work (it's getting better) I started prep work on the fibreglass tail fairing. As per the VAF website, the standard operating procedure for fibreglass is:

Wash, dry, wipe with acetone, sand, wash, dry, wipe with acetone, squeegee epoxy, then go back to sanding again, for multiple cycles until you have filled "enough" pinholes.

I did the squeegee bit but did not think to finally brush smooth the excess epoxy. So I ended up with epoxy "runs" that will be a nightmare to sand flat.

Finished off the day with a few more rivet heads filled with Superfil.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.