KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  5-10-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Cowling

Put a coat of grey primer on the cowl halves and dry sanded them a bit. They still need lots of work, but I'll have time for that later. Also installed the hose in the cockpit for the manifold pressure. Put the oil door on and installed the spring. Works great, and after I rolled the forward edge a bit, it sits down fairly well. I'll have to work on that a little too.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.