KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  11-20-2008
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Engine Mount

Finished drilling and installing all the bolts on the engine mount. I didn't put the cotter pins yet, because I'm not sure the engine mount is on for good. It will be close to see if the nose gear bolt will go through the pre drilled hole in the firewall, and through the mount and gear leg. I may have to loosen the engine mount before getting that bolt all the way through. Unfortuneately, I returned the nut for the nose gear leg that holds the nose gear on, so I have an order in with Vans. I was also missing a fitting, a modified AN elbow fitting for the oil pressure sender hose. Finally, I assembled the nose gear, minus the final nut and drilling for the cotter pin. Then I cleaned up. I'm off to the dump to take the finish kit box, now that I've got the engine mount on. Got to make room for the engine, which should be coming in a few weeks.
' style=

Nose Gear, all ready but the nut

Nose Gear, all ready but the nut

' style=

Engine mount installed

Engine mount installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.