KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  4-27-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Baffle Seal, misc.

Installed the front baffle seal, and trimmed all the baffle seals so that I could get the top cowl back on. It'll be tight, but that's the idea. To seal the baffles against the top cowl, so cooling air goes where I need it to go. Then I installed cooling tubes for the magnetos, and sealed them with RTV. Then I installed the engine breather tube, which goes down to the exhaust, so excess oil thrown overboard will burn on the exhaust vs. getting all over the belly of my plane. Then I rotated the heater muff a little and installed the hose from the baffles to the muff. I'm leaving the hose from the muff to the heat valve for a little later, as it might get in the way of something less flexible. Then I installed a ground wire from the engine to the firewall. Finally, I started messing with installing the fuel flow transducer, but didn't get much done on that other than get the right sized bolts. This entry makes 70 hours in the month of April. My record month so far. Must be getting close!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.