KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  4-16-2009
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuel Injection, exhaust

Finally got all four nuts on the studs holding the main part of the fuel injection on the bottom of the engine case. I had three all tightened up, when I realized that I had to have them all loose to get the fourth nut started. So, off they all came, to replace the used lock washers with new ones, and got all four done. Then I put the exhaust on. I was missing a few nuts, so I put a call into Larry Vetterman, who made my exhaust system, and he's going to put some in the mail. Also told me that I don't need to run air through the second muffler, so I was able to remove the shroud that goes over the muffler to warm the air going to the cabin heat. If I need it, I can replace the shroud and plumb both mufflers to heat air for the cabin. Don't think I will.
' style=

Air metering section

Air metering section

' style=

Right side Exhaust with muff

Right side Exhaust with muff

' style=

left side, without heat muff

left side, without heat muff

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.