KitLog pro

Powered By Kitlog Pro v2.0

Greg's RV-9A Builder Site
' style=
Date:  2-20-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Battery Cable

Finished laying the fat wire for the battery power through the under seat ribs to the sidewall and main spar. I can't push it though the main spar until I get the gear mount bolted in. I received lots of components from B&C, and other places for my electrical system. I started planning the location of those things on the two side panels near the battery. On the right side, I'm going to have the battery power feed towards the front, and on the left side, the aircraft ground fat wire from the front. Otherwise, they pretty much have the same things, in slightly different locations according to cable length. I ordered some battery cables from B&C that were either the wrong length and/or the wrong size lugs. All my fault. So, I'll have to get more of those when I finalize the location of components and I can measure accurately. I should have waited anyway. So, not a whole lot accomplished today, despite 4 full hours.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.