KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  12-22-2021
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wheel Fairing Work pt. 28

Set up for wheel fairing work; pondered options. Masked parts for epoxy work; prepped surfaces of forward wheel fairing halves. Mixed microballoon slurry and applied in front of the leading edge of each lower intersection fairing. This will direct the oncoming air onto the top surface of the intersection fairings and prevent air from passing between the parts.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.