KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  9-25-2021
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Fuselage Final Assembly pt. 2

Airframe inspected by DAR prior to further cockpit assembly. Secured flap wiring. Checked all jam nuts for control column rod end bearings. Found one loose jam nut and one temporary nut on front control stick; tightened jam nut and assembled stop nut on bolt; torqued and sealed all nuts. Installed right console cover and front seat ramps. Some console screws will need to be replaced with set screws due to limited access. Left console cover will remain off until after fuel pump testing.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.