Brief Description: Mount Horizontal Stabilizer pt. 1
Relocated fuselage slightly toward center of shop. Removed wheels and leveled fuselage side-to-side and fore-and-aft with scissor jacks under fustand frame. Used long, torpedo and electronic levels to confirm accuracy. Cut and deburred F-801E and F-885 spacers. Removed all control surfaces and vertical stabilizer from empstand. Placed horizontal stabilizer on aft deck and spacers, including 3/16" wood shim for rear spar. Clamped horizontal stabilizer in place on fuselage and checked level; required thin shim under right spacer. Re-clamped and double checked numerous times to make sure everything was level and centered.