Powered By Kitlog Pro v2.0
Bear with Me!
Bearhawk
Windows & Doors
11-7-2017
< Previous Log Entry
Next Log Entry >
Date:
11-7-2017
Number of Hours:
8.00
Manual Reference:
Brief Description:
Right front door start
Made right front door post windshield fairing from 0.025" 3003 aluminum.
Also started miter cuts of alumuminum square tubing for right, front door.
Top right = 98 deg, miter = 41 deg
Top left = 83 deg, miter = 48.5 deg
Bottom left = 111 deg, miter = 34.5 deg
Top of front door will have 1/8" gap at hinge.
All other gaps will be 3/16"
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Marsh Tracker Home
Bearhawk Home
Category
# Logs
# Hours
All
642
3164
Avionics
6
19
Boot Cowl-Tunnel
14
82
CS Prop
5
20
Electrical
6
32
Empennage
68
313
Engine
24
120
Engine Cowling
24
153
Fabric
29
187
Flight Controls
66
277
Formers/Stringers
37
148
Fuel System
16
57
Fuselage
82
442
Instrument Panel
9
55
Interior
14
72
Landing Gear
42
186
Prime-Paint
30
198
R&D/Education
1
6
Vans FAB & Air Scoop
14
54
Weight & Balance
2
10
Windows & Doors
36
175
Windshield/Skylight
16
93
Wings
101
465
Copyright © 2001-2024 Matronics. All Rights Reserved.