KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  3-6-2016
Number of Hours:  2.90
Manual Reference:  
Brief Description:  Drilling of flap torque tube

Verified correct lateral position of flap arm and moved to 30 deg forward using template.
Drilled wood jig and cut to correct length to hold flap arm at 30 deg forward. Made some spacers for drill block from 7/8" x .058 tube so drill block would be correctly aligned on torque tube. Pulled flap pushrod down to stop with tie-wrap. Using drill block to center, drilled 1/8" hole through left flap torque tube on outboard fitting. Drilled that out to 11/64" and reamed to 3/16".

Completed drilling, bolted, and installed flap springs.

Completed drilling of right side torque tube and installed flap springs.

That was a task that I'm glad to complete. Had been a job I was concerned about completing successfully and correctly.
' style=

Wood jig holding at 30 deg forward.

Wood jig holding at 30 deg forward.

' style=

Set up to drill 1/8

Set up to drill 1/8" hole first.

' style=

Drilled, bolted and done.

Drilled, bolted and done.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.