Worked on eactualllevator bellcrank install. NOTE: Following my approach, not exactly per plans. The scale for mounting bellcrank on plans a little off. It needs to be mounted lower to have clearance at the top. For this reason I made the tubing it rotates on a little longer since it will be a little higher in the tubing V of STA CS. Fought with clamps trying to correctly clamp in position. Installed pushrod and used tie-wraps to hold in position. Worked great! Also found that 2 x 4's (1 1/2") positioned the bellcrank at just the right height. Used 1/8" spacer at top to make sure had clearance.
Everything in position, will tack in place tomorrow.