KitLog pro

Powered By Kitlog Pro v2.0

Bear with Me!
' style=
Date:  5-14-2015
Number of Hours:  7.80
Manual Reference:  
Brief Description:  Forming of LG bushing ends

Working on second attempt at forming top ends of LG at bushings. Hammer on anvil not precise enough. Decided to use angle iron "smooshe" with .100" insert to keep things in place.

Fitted left front tube with nine trips to grinder using the Wayne M method.
Installed sleeves per EN July 2009 with Loctite 620 (high temp).
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.