Brief Description: Bottom Fuselage tack welded both sides
Been off for camping trip. John Bread came by to help. Cut/fit remaining T-10 and T-11 diagonals. John made 1" and 7/8" spacers for conduit clamps that will be used during bending. Pulled/cleaned all tubes and longerons to clean for welding. Re-jigged and shimmed for welding. Tacked top and bottom of bottom fuselage.