Brief Description: Re-leveled firewall, and fabricated LWR/FWD longer
My vertical 2 x 4's at the front of the jig, holding the firewall, were slightly out of vertical somehow, so with a little chain, and a couple turnbuckles, had them square again, and the firewall was now 90.0 deg vertical.
I fabricated the two 1x1 angles that make up the lower forward longerons. I also drilled the 402 bulkhead to the frame.