Brief Description: Flipped the fuse upside down, did some riveting on
Today I flipped the fuse back upside down. Much easier to get to what I needed to get to. I finished up some riveting on the F405 and F406 bulkheads, that I had been putting off. Now I can finish fabricating the floorboards.Also started on the F451 outlet walls behind cowling and main gear legs.