Brief Description: Backriveted center longeron on aft side skins
Had a little time tonight to get out and work on the aft side skins to get them ready for their last trip to the jig. I ran an edge roller down the sides to keep a nice tight finish after riveting them on. I back riveted the center longerons on each skin, except for rivets that passed through a bulkhead. Now they are clecoed to the jig and100% ready for rivets. I also started riveting on the aft bottom skin, and worked my way forward to the 409 bulkhead. I might need do to a little shimming on the bottom of bulkhead 408, as I suspect a little bit of oil canning just aft of it.