KitLog pro

Powered By Kitlog Pro v2.0

Greggs RV-4
' style=
Date:  10-7-2008
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Getting RH elevator ready to prime

Today I sanded, scuffed, and prepared the RH elevator for prime. It is quite a chore to get a smooth transition from the elevator skin to the fiberglass fairing. However, with a LOT of elbow grease, the end result is a very smooth finish.
' style=

Getting ready to prime

Getting ready to prime

' style=

RH elevator tip, sanded

RH elevator tip, sanded

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.