KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  3-22-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Fuel Level - sensor wiring

Fitting continued on the forward skin, and made a couple of minor preparations for the final installation.

Finished rivets on the forward portion of the aft skin (near rollbar) and made changes in 2 bolts found to be too long for the rolbar. Re-torqued and finalized.

Put grommets in the fuselage for the fuel level sensor wires, and

Gordon stopped by and we pressure tested his tank re-sealing. Leaks persisted. Went to EAA mtg.
' style=

Fuel sensor wire

Fuel sensor wire

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.