KitLog pro

Powered By Kitlog Pro v2.0

RV-6A - GBC
' style=
Date:  2-15-2015
Number of Hours:  1.70
Manual Reference:  
Brief Description:  AFP - Boost pump package, lines

Added the nutplates to the angles, Adel & nutplate to secure return line, connectorized pump wiring. Wrapped and routed some wiring. Adjusted 3/8" tuning to FW.

Misc issues related to fabrication of a center console housing, Secured the cable to the manual trip cable with an Adel clamp. Added Adel clamps for the 3/8" tubing from the L & R fuselage feed lines.
' style=

Details added

Details added

' style=

Some wiring added

Some wiring added

' style=

Selector fittings

Selector fittings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.