A long day in uncomfortable positions, with lots of prototype adjustments.
R & L feed lines in to the tower and to the fuel selector, R & L brake lines to the bulkhead fittings on the floor near gear legs. Re-pulled some elctrical lines from right side conduit and and re-routed into center console.
Rivets, nutplates, and assembly of the AFP pump/filter components.